I-40
High point city
Piedmont triad international airport
Greensboro city
Winston Salem city
Fedex ground facility
The building will be constructed on 113 acres within easy reach to Interstate 40, close to Greensboro and Winston-Salem with access to
a large labor force.
Ecolab operations team and PNK group work closely together to design the building to the specific demands of the various business units that will occupy the premises for both today and for the future.
PNK park High Point will feature five cross-dock buildings sized from 400K SQ. More than a million square feet of Building A is currently under construction. Multiple other options are available for customers, including build-to-lease, build-to-suit and land-site development.
The facility is ideally suited for warehousing, manufacturing, logistics and distribution. it’s close to the FedEx Ground facility and less than a 10-minute drive to Piedmont Triad International Airport. Industrial facilities are serviced by Duke Energy and Piedmont Natural Gas.
Under construction
1050K SF
Configuration
Cross Dock
Column Spacing
Typical 55’d x 56’w; Staging bays are 70’ deep
Walls
Tilt panel, painted, textured with reveals on exterior
Ceiling
Height minimum 40’ 6” inside first column after dock bay
Sprinkler type
ESFR (Early Suppression Fast Response) in accordance with FM Global
Roofing System
TPO roof system with R-20 Polyiso insulation and white steel primed deck
Clerestory
5’x 8’ double glazed in aluminum frames above dock doors
Ventilation
Fans/louvers designed for 3 air changes per hour